Vconnct Developers
V4

LTI Phase 2 Documentation Verification

Source-alignment checks, actual documentation verification, and outstanding Phase 2 release gates.

LTI Phase 2 Documentation Verification

Date: 2026-10-28. Documentation-only source alignment, not Phase 2 completion or deployment acceptance.

Scope And Preservation

  • Checked git status --short before inspection in developer-guide, devkit-backend, and devkit-front-end. Developer-guide started clean. Existing staged/unstaged backend and frontend work was left untouched.
  • Read each repository's AGENTS.md, README.md, and .gitlab-ci.yml; no additional content-level AGENTS.md was found in developer-guide.
  • Read the frontend approved Phase 2 implementation plan, unfinished handoff, logout policy, and verification report; read backend docs/lti/frontend-integration-contract.md, force-disable-reconciliation.md, and its 2026-10-28 verification report.
  • No private .env contents, live APIs, LMS/provider requests, commits, pushes, deployment, or migrations were used. No application code or Phase 3 work was changed.

Changes And Source Checks

DocumentationCorrection and inspected evidence
moodle-lti.mdxRemoved automatic AGS/end-meeting grades and required grade-permission instructions. Checked backend app/lti/routes/lti_routes.py end-meeting handler and absence of debug/grade route call sites; AGS library remains separately present.
moodle-lti.mdxAdded recording issuance then authenticated POST consumption, session binding/current authorization, retired GET, legacy rejection, configured-origin/path checks, no bearer URLs/provider headers, coordinated rollout, and limits on revoking returned media URLs. Checked backend recordingService.py and consumption route; frontend src/services/lti/ltiApiClient.ts and LtiWorkspacePage.tsx watch/popup flow.
moodle-lti.mdxAdded owner/admin-only fail-closed management, exact issuer/HTTPS registration, and enable eligibility. Checked backend app/managment/utils/lti_management_auth.py, platformService.py, and integration contract.
moodle-lti.mdxAdded confirmed/failed/unknown force-disable outcomes, retained leases, persisted reconciliation discovery, repeat-disable/enable limits, and approved operator recovery guidance. Checked platformService.py and force-disable runbook; HTTP success is not provider proof.
moodle-lti.mdxAdded verified launch locale EN/AR normalization/fallback and trusted configured redirect handling, manual current-session switch, navigation guards, and independent logout. Checked backend utils/locale.py, locale launch/session call sites and logout route; frontend localized entry page, selector, session/tab/scope restoration and playback flow.
canvas-lti.mdxLinked shared safety rules, qualified recording availability, clarified target-organization management and local-only HTTP examples. No live Canvas acceptance claimed.
sakai-lti.mdxRemoved contradictory grade-publication/setup/troubleshooting claims and linked shared rules. Sakai reference does not establish active-target or live acceptance.

Current LtiWorkspacePage.tsx wires capability-gated recordings/publication/playback, history, roster, and instructor one-time schedule components. This does not turn any remaining Soon/commented/disabled workflow into an available feature. Recurrence, attendance/manual attendance, CSV export, readiness filters, and other pending workflows are not activated by this documentation task.

Actual Verification

  • Source and contract cross-checks above completed; application suites were not rerun for this documentation-only task.
  • git diff --check passed; only Git LF/CRLF conversion notices were emitted. The new report was also checked separately for trailing whitespace.
  • Compiled all three changed MDX guides and this Markdown report with the installed @mdx-js/mdx compiler after stripping frontmatter: four syntax checks passed. This direct Node check did not load Next.js or environment files and generated no files.
  • Reviewed the tracked documentation diff for scope and claims; checked local documentation link targets and the shared safety-section anchor.
  • No Next.js build was run: the workspace contains a private .env, and this task must not load it. No deployed headers, browser popups, provider termination, or real LMS behavior was tested.

Remaining Gates

  • The frontend handoff/verification report is an unfinished checkpoint, not current-source acceptance. Existing local UI work and evidence were not accepted by this documentation task. EN/LTR and AR/RTL navigation, session preservation, popup/error/stale-result behavior, interaction states, responsive behavior, accessibility, and production build acceptance remain separate gates.
  • The backend report records 729 scoped LTI/AGS tests passing, but also full-suite collection/failure/timeout blockers. These are prior reported results, not checks rerun here or proof of full Phase 2 acceptance.
  • Authenticated recording consumption requires coordinated frontend/backend deployment, verified configured origins/headers, and fresh capabilities. External LMS membership freshness depends on synchronization; already returned provider URLs are outside unused-capability revocation guarantees.
  • Force-disable requires authoritative provider/lease verification and approved operator reconciliation. Re-enabling or an empty discovery response does not establish termination.
  • No trusted Moodle logout synchronization contract is implemented. The separate sandbox Moodle Invalid request issue remains unresolved; no fix is claimed.